ESQ Stage 3 Blockwork

Penrith, NSW. Face blockwork piers and walls laid from the scaffold by the Master Group Masonry team on a multi-building apartment development.

Blockwork project

ESQ Stage 3 Penrith Face Blockwork

ESQ Stage 3 is a multi-building apartment development beside the lake in Penrith. Master Group Masonry laid the face blockwork: light, textured block piers between the balconies and long runs of face block walling, laid from the scaffold with crisp coursing and clean mortar joints.

What we did

  • Face block piers between balconies on every level
  • Long runs of face block walling
  • Laid from the scaffold across several buildings

Finished work

The completed work in Penrith.

A four-storey ESQ Stage 3 apartment building with face block piers and a charcoal brick base · Nov 2025
Face block piers framing the balconies of ESQ Stage 3, Penrith · Jun 2026
ESQ Stage 3 apartment buildings in a row along a new street in Penrith · Jun 2026
Charcoal brick base and light face block piers at the corner of an ESQ Stage 3 building · Oct 2025

During construction

Taken by our team on site while the work was under way.

Aerial view of ESQ Stage 3 under construction in Penrith, with the lake and Blue Mountains beyond
A row of face block piers along the scaffold deck at ESQ Stage 3
Face blockwork piers taking shape on site at ESQ Stage 3, Penrith
A Master Group Masonry layer setting blocks on the scaffold at ESQ Stage 3
Close-up of face blockwork and its mortar joints
A long run of face blockwork with crisp coursing at ESQ Stage 3
Looking up a finished face block pier at ESQ Stage 3
Block piers and scaffold along the building edge at ESQ Stage 3
An ESQ Stage 3 building in Penrith with face block piers between the balconies and scaffold still on one side · Oct 2025

Services used on this project

More projects

All projects